LCRR: Final Sheet of Drywall Hung!

A milestone was reached on the Louisiana Central Railroad this week . . . the last sheet of drywall has been screwed to the walls! It was quite an adventure for this rookie and his able-bodied assistants (who were also rookies). But we got ‘er done! It’s not pretty, and there are a lot of gaps here and there, but it’s up, and it’ll stay that way.

The Last Sheet of Drywall
The last 8 foot sheet of drywall was split in two. The first panel is at the far end of this alcove, extending from the seam near the left leg, to the corner at right (virtually blocked in this view by the plywood “panel” on the leg-set). Most of the bracing has been temporarily removed from the leg-sets adjacent to the walls.
The Last Sheet of Drywall (close-up)
And here is the rest of the view. The first panel is at left, the second panel extending from the corner, right about ten inches past the photo edge. That electrical box was the last hole to be cut into drywall (whew!).

The next major step is the taping, floating and texturing of the drywall to match the upper part of the room. But first, there is plenty of preparation work to do. I have to tidy up and tape down all the plastic protecting the top of the layout. I also want to wrap all important things below the layout surface such as Tortoise switch motors, wiring junction points, throttle plug-ins, etc. I hope to avoid drywall dust getting onto and into these things. I am also considering wrapping all the leg sets to avoid spraying drywall texture on those as well. And finally, I want to eliminate as much “clutter” under the layout and aisles as possible to make access better, and to avoid the possibility of having everything covered in drywall dust.

I also have the restroom lavatory’s vanity “under construction” (it’s a kit, and I’m modifying and strengthening it). I hope to have it ready to slip into place as soon as the finishing is complete in the restroom.

There’s plenty left to do, but the first major milestone is complete! My thanks again to Wayne and Ron for their assistance in getting to this point.
Cheers!

For those new to the blog, you can see the post Rising From the Ashes (Part Deux) for a starting point to read the story behind this work.

4 thoughts on “LCRR: Final Sheet of Drywall Hung!

  1. Soon able to lay your brass track and hook-up the D.C.,,,,LOL
    Just wait till the DCC hair pulling stage starts!
    Hope all falls into place as you dream it!

    • Hi Boudreaux,

      The DCC wiring is actually pretty far along, as I’ve been doing the wiring as I installed the trackage. The only significant wiring left are the rail feeds for the trackage that still has to be installed. What is there was working perfectly before the flood, and I anticipate that it still will be just fine.

      Optimistically,
      -Jack

Comments are closed.