Now that the drywall has been hung in the shop and restroom, I’ve turned my attention to the train room itself. This is where the challenge starts! All of the work must occur under the layout benchwork structure. Here are a few photos to portray what is happening.
I’ve been preparing the other walls in the room as well, with all “cleaned” and ready for insulation and drywall. It’s slow going, but at least it’s going. 🙂
For those new to the blog, you can see the post Rising From the Ashes (Part Deux) for a starting point to read the story behind this work.
3 thoughts on “LCRR: Repairs Started in the Train Room”
Just think,
This winter, you will be warm and dry in your Little (HO) World!
With a smile from ear to ear.
Been there.
hopefully i can help some next saturday after breakfast if you want to
Just think,
This winter, you will be warm and dry in your Little (HO) World!
With a smile from ear to ear.
Been there.
hopefully i can help some next saturday after breakfast if you want to
And you did . . . Thanks, Ron!
-Jack