Train Day at the Library

This upcoming Saturday, January 18th, will see the second annual Train Day at the Library event over in Baton Rouge.  The main features of the event are the numerous railroading slide presentations.  There will be a number of other displays hosted by a couple local model railroad clubs, the Southeast Louisiana chapter of the NRHS, a few individuals and of course, the Operation Lifesaver display presented by a couple of the railroads in the area.  The event will be at the Jones Creek branch of the library, located at 6222 Jones Creek Road in Baton Rouge.  The show opens at 10:00 am and runs until about 4:00 pm.  Hope to see a few of y’all there!

A bit more progress has ensued on the layout.  I have the infrared LEDs installed and wired up at Monterey (these are the light sources for the optical detectors recently installed).  The final track bus run for the second booster district has been installed and connected, leaving only the third (and final) booster district to wire.  I even got a start on the trackwork at the east end of the Willis yard and hope to continue that next weekend.

As most of you folks reading this know, Lou Schultz is still struggling with his foot issue, along with low oxygen levels.  I miss going over to his place for the operating sessions, and seeing him and the other guys in the group.  Please keep Lou in your prayers for his recovery.

And finally, there is a fellow up in Canada that is building a nice layout which he calls the Port Rowan.  It’s a model of a Canadian National branch line set in the 1050s.  Trevor Marshall is his name and he regularly posts updates with photos, along with other trivia to his blog.  I admire his modeling skills and find his blog entertaining, so I thought I’d pass along the link:  Port Rowan in S Scale .  Give it a look.

-Jack

Clyde F. “Bill” Williams

I would suspect that by now, most of you reading this blog have received word of Bill’s passing. It seems like only yesterday we lost Shawn Levy, and now this.

I am still in a state of shock. Even though in the past couple decades I only saw Bill roughly every six weeks, I considered him one of my best friends. Bill and I met years ago when he and I were both members of the Crescent City Model Railroad Club in New Orleans. At that time we were operating at Lou Schultz’s place in Lakeview, on the layout located up in the attic.

Bill and I have always kept up a spirited banter, though it’s always been in the spirit of friendship. I can’t imagine going to operating sessions now and not seeing and hearing him.

Bill had a lot of eccentricities, but I wouldn’t change a single one because that is what made Bill such an interesting character. I’ll miss him dearly.

Another one of the truly good guys is gone…

R.I.P. Bill

-Jack

Operations to Resume on the C&O

Operations will resume on Lou Schultz’s C&O Railroad next month after a long embargo.  As you may recall, back in (about) February Lou had some health issues to deal with and that led to a temporary suspension of operating and work sessions on his layout.  Lou’s doing better now and for several weeks work crews have been feverishly working on the layout in an attempt to correct some bugs and other problems.  The next operating session is scheduled for June 22nd, and I’m looking forward to seeing the crew again.

This session will be in 1951 which means we’ll have a mix of steam and diesels running.  I really love seeing those Alleghenies running down the mainline, but have to confess that I’d much rather operate a lash-up of diesels because they simply operate better on Lou’s layout.

Photo of C&O Railway 2-6-6-6 Allegheny Locomotive

When the time moves up to 1955 in sessions later this summer, I’ll be bringing my trusty (Atlas/Kato) ALCO RSD-5 to the sessions.  She is equipped with a Tsunami decoder and she runs and sounds great!

I’ve been busy each weekend working on the Louisiana Central.  The sub-roadbed (tabletop) is complete along the entire north wall of the room (that’s the wall on the right side of the track plan).  The Illinois Central sub-roadbed leading into the staging area on the east wall (bottom wall in the plan) is almost complete…just one more “section” to go on to the end to finish that.  While doing that, I’ll probably go ahead and extend that sub-roadbed to the far side of Monterey as this will become the Texas and Pacific hidden staging track at that point (again, check the plan so what I’m saying becomes clear).

The sub-roadbed (and tabletop where applicable) is starting to get “easier” as I learn and find better ways to get the construction done.  I’m lagging on the trackwork itself because of my focus on the supporting structure, but that’s okay because trains won’t roll until ALL of it is done.

As usual, comments are welcome.

-Jack

Remembering Shawn Levy

I’m sure most of you reading this have heard that Shawn recently passed away after a brief bout with cancer.  I last saw Shawn while he was undergoing diagnosis over at the North Oaks Hospital in Hammond.  I visited with him for a couple hours and although I could see he was exhausted, he was still his usual upbeat self.  In a couple email exchanges after that (the most recent was a week or so before his passing), he had a positive attitude and didn’t even hint that this cancer was a real problem.  He was just being Shawn . . . ever optimistic.

So it was with great surprise that I received the message of his passing.  On the one hand I suppose that I should have seen it as almost inevitable, but yet with Shawn, you just can’t make that assumption as his spirit was contagious.  His loss weighs heavily on me.

For several days after his death I read a dozen or so posts on the LRMRG Yahoo Forum, and I’ve received quite a few emails about this also.  One thing that I repeatedly read was the writer’s claim that Shawn was such a close friend; in fact, many of the writers felt that their friendship with Shawn was perhaps special; closer than those other folks around him.

Then it suddenly hit me.  They were special and close to Shawn, each and every one of them.  That’s because Shawn had a way of making each person he spent time with feel that he considered them a special friend.  He would talk to you one-on-one.  He would spend time with you and listen to your stories and viewpoints.  He would relate to you and always seemed to have something in common with you.  He was a bright, gifted, funny and outgoing individual, but he never portrayed himself as superior.  It was easy to be a close friend to Shawn because he made you feel that he considered you a very close friend.

So as it turns out, everyone was accurate in what they said.

Rest in peace Shawn, my good friend.

-Jack

More Track Going Down

Layout progress continues at a slow, but indeed at a steady pace.  As you’ve read in previous posts, I’m starting with all of the (mostly) hidden staging track as it’s the furthest away from the aisle and the most difficult to work with.  The Louisiana Central trackage is complete, including wiring, and is operational, sans a switch machine at the entry to the area.  This past weekend saw the start of trackage for the Illinois Central staging area.  I’ve got enough roadbed completed to do all of the staging track at that end of the layout.

I’ve run the power bus along with the track I’ve been installing, and tapping the bus along the way to feed the track as I progress.  I have the bus temporarily connected to the command station/booster for testing purposes.  Last week I installed a backboard and shelf for one of the three planned booster districts.  I’ll be using DCC Specialties PSX circuit breakers to further sub-divide each power district, and I’ve installed the three C/Bs for the district I’m working in.  I still have to run the interconnecting wiring between the booster and the C/Bs, and then connect the power buses.  When that is done, the wiring for the entire sub-district will be complete, and the other sub-districts can be connected as they’re run.

I don’t generally get any work done on the layout during the work week, however I thought maybe I could devote a bit of time in the evenings to working simple projects, like building car kits and such.  I have an old roll-top desk in my living room that is unused, in fact it was my hobby workbench before my permanent bench was completed out in the train building.  I’ve decided to reactivate the old desk as a secondary workbench, and have recently started to restock it with common tools and supplies….whatever is needed for the “simple” projects.  I have read several times that doing small tasks like that can have a significant impact on overall progress, so I’m going to give it a shot.

As I’ve mentioned before, I operate regularly on Lou Schultz’s C&O Railroad over in Covington.  I’m sure most of you know that Lou has been going through quite an ordeal with a health issue for the past month or so.  Please keep him in your prayers to help get him through this.

-Jack

January – It’s Been a Busy Month

January has been a great month for railroading.  I’ve been attending events for the past three weekends, and have yet another this Saturday coming.

The Crescent City Model Railroad Club in New Orleans held their annual open house early in the month.  They’re in the process of converting their layout to DCC operation, and since the layout would be down, they decided to remodel several major sections.  Wayne Robichaux and I went down to inspect their progress and also to hit the few remaining hobby shops in the area.  Unfortunately there doesn’t seem to be a single decent model railroad shop left in south Louisiana.  A few shops we hit had nice selections of Lionel and similar, but us “scale” guys are left in the cold.

The following weekend Ron Findley and I drove over to Hattiesburg, Mississippi to attend the annual banquet of the Mississippi Great Southern Chapter of the NRHS.  Those folks put on a fine get-together.  There were several vendors displaying their wares, the dinner was good, and the guest speaker was quite interesting.  It was good seeing old friends and acquaintances over there.

This past Saturday several of us drove over to Covington to operate on Lou Schultz’s C&O layout.  Overall the session went well, there were plenty of snacks to chow down on, and as usual, it was good to meet with fellow model railroaders.

And finally, this Saturday, January 26th, there will be the Train Day at the Library event at one of the local libraries here in Baton Rouge.  There will be numerous displays about railroading (prototype and modeling), possibly a display layout, and many slide presentations by Forrest Becht, a noted railfan and photographer.

Oh, BTW . . . I actually managed to get a bit of track laid on the Louisiana Central.  I’ve been struggling back in the corner of the room it seems forever, but we’re finally getting rail down.  I’m using Atlas code 83 track and switches for my hidden track (which is what I’m laying presently), and I’m not too impressed with the construction of the switches with regards to soldering jumper wires to them.  Soldering rail feeders isn’t too big a deal, but soldering jumpers to the points is!  They’re just formed sheet metal and I found it quite difficult to tack a wire to the lower portion of the point so it would clear wheel flanges.  Despite my efforts, I had to do considerable filing afterwards to clear the NMRA gauge nubs.  And the frog . . . what a pain!  The frog doesn’t accept solder well, but there is a small tab with a hole sticking out to one side of the frog.  I couldn’t find my taps, so drove to a friend’s house for him to tap the holes for me.  Then I screwed a 1-72 screw to each and added a nut to the bottom.  I placed a dab of solder below the nut so it will never come loose, then soldered a jumper to the screw.  Despite the precautions I took (good hot iron with freshly tinned tip, and a fast in and out technique) the thin plastic surrounding the tab melted away and the cast frog on one switch came loose from its mounting in the switch.  Now I need to figure out what kind of adhesive I need to use to adhere metal to slippery plastic so as to permanently reattach the frog on that switch.

That’s about it for now.  My main focus on the layout will be to get track laid, hopefully at a steady rate.  Leave a comment if you have any questions or suggestions.

-Jack

It’s Fall …and it’s Railroading Time

We’re getting into my favorite time of the year for model railroading and railfanning.  The temps have come down and the rains have slacked off . . . we’ve had some beautiful days these past several weeks.  Last weekend was the annual open house for the railroad club up in Jackson, Louisiana.  As usual, they had all of their layouts on display and operating.  I don’t think many clubs can boast of having an operating layout in each of the major scales.  And the outdoor operations are fun to watch also.  Their G scale garden railroad is pretty cool, and of course, the operating live steam loop always has some really nice equipment under steam.  I got there about lunch time (and consumed one of their complimentary lunches), but ran out of time before I got to visit all of the layouts.  It appeared to me that they had a nice turnout for the event.

This weekend coming Lou Schultz over in Covington will be having an operating session on his C&O layout.  There is also the annual railroading event over in Meridian, Mississippi this weekend.  It’s too bad that it conflicts with Lou’s session, as I would like to do both.  And the weekend following this will see another operating session down at Art Houston’s layout in Houma.  This is also the time of year that we occasionally have a train show, either in Covington or Gonzales (unfortunately, there is no show scheduled for this year).

It’s also a great time to spend next to the tracks, with the mild days and crisp weather.

I’m still working on my layout, though at a bit of a reduced pace.  As I reported earlier, the basic framework of the benchwork is all but complete.  I’ve turned my attention to the sub-roadbed and risers this past month.  I am working in one corner of the room where several of the tracks going into the hidden staging area will be located.  It turns out that this is a difficult area to lay out and build.  A couple of the tracks at the rear are on curves and are descending at the same time.  They start at different places, but ultimately end up on the same hidden roadbed.  It is challenging to say the least.  I would have rather started in an area of straight, level track to kind of ease into things, but the more I thought about it, the more I realized that it would be much easier in the long run to install this complex area, then build out away from it, than to do it the other way round.

I haven’t posted any pictures lately as I want to wait until I have some track actually spiked down.  Trackwork in place signifies to me that the section is complete, thus ready to photograph.

I have my vacation time coming up later this year, and I hope I am able to use some (most) of it working on the layout.

-Jack