Yet another milestone has been reached in the flood recovery efforts: all of the building walls have been primed and painted. The shop (hopefully) will soon be receiving new cabinets. The floor tiles reveal the footprint of the original cabinets.


In addition to the cabinets, the next step is the installation of the doors, and the trim-out. Flooring will follow that.
cool
Jack, that’s looking great!