Side Stepping Burn-out, Part Deaux

I have to confess, I really haven’t felt much like working on the layout for a couple of weeks now.  Sure, I’ve been heading out to the layout room most each day, but I really haven’t been very productive . . . mostly looking for “low hanging fruit” to work on.  I reconditioned a bunch of old Tortoise switch motors.  And I transferred a sound decoder and speaker from a “basket case” Bachmann modern 4-4-0 to another similar model I have that is running and intact.  Another small project completed.  And I spent a day checking out my newly repaired digital camera.  But none of this was advancing the state of the layout itself.

The last two weekends have featured back-to-back NRHS* Chapter banquets, one in Hattiesburg, Mississippi, and the other in Hammond, Louisiana.  I attended both and thoroughly enjoyed every aspect of each day.  The journeys were good, the meals were good, the presentations at both were excellent, and most importantly, I really enjoyed the company of fellow modelers, railfans and historians.  Today was the Hammond event, and afterward Ron Findley and I headed over to the train depot to hopefully catch a few trains.  Traffic was a bit slow, so we decided to just stroll down Cate Street (along the track) and I started photographing the wonderful old buildings along that street.  I guess Ron and I really got caught up into it, as we ended up strolling to the end of the business district, then started down Thomas Street where we repeated our photographic endeavors.  And then there was Oak Street, and finally, Church Street.  I believe I ended up with several hundred images, and I totally enjoyed our little foray.  We eventually found our way back to the depot, where I noticed that there was quite a bit a material staged along the tracks and maintenance-of-way area.  There was a crane parked on a spur, and one of those neat (Difco?) side dump ballast cars.  Lots of rail, ties, ballast, spikes, tie plates and more.  I suspect that this was material left over from the recent trestle repairs down at the Bonnet Carre Spillway. For those of you who are unaware, the CN experienced a major fire there a couple weeks ago that took out an entire span of trestle between two concrete fire breaks.

But back to my original confession above, I have been going “hot and heavy” on the layout construction for over a year now.  You long time readers may remember I went through an intense period of burn-out during my second year of construction and got very little accomplished, relatively speaking, as a result.  I even wrote a post about it, Side-Stepping Burn Out.  When I returned to serious construction a few months later, I knew I would have to change my work habits to help avoid this problem in the future.  In large part, I’ve done better because I will work on something -say, trackwork- for several weeks, then I’ll switch off to something else; benchwork, electrical work, workshop projects, just about anything to break up the repetition and boredom that sometimes occurs when building a relatively large layout (mostly single handedly).  But the burn-out symptoms have been rearing their ugly head again for some time now.  And I’ve simply backed off from what I’ve been doing.  I’m feeling a bit better about things now, especially after these two great Saturdays, and I suspect in another week or so that I’ll be raring to get after it again.  To be sure, I continually feel some guilt for letting this time pass without “real” production, but I’ve told myself that this is after all, a hobby.  And if I’m not happy doing it, then it ain’t a hobby!

So not to worry, the Louisiana Central will continue to see heavy construction, albeit with just a short delay.

Hmmm, now I’ve got to figure out how I’m going to fit those neat city buildings in over at Willis.

-Jack

*National Railway Historical Society