Multi-front Expansion

I’ve been working in two different areas of the layout these past weeks.  As I mentioned a couple posts ago, the Louisiana Central mainline now extends from Willis Junction (the point at which the mainline enters the layout from staging) to the east end of Maynard.  This past week I completed the roadbed through Maynard along with the roadbed required for the two industrial switches in town.  The area is now ready to lay track, possibly starting this weekend.

Here’s a direct link to the layout trackplan.

The other area seeing heavy construction is the east end of Monterey.  I’ve got the sub-roadbed extending from the room corner (where the mainline will curve around to enter Monterey) to the yard ladder.  This section of layout will also contain a wye to be used to turn equipment when required.  This entire area is essentially just a Homasote topped table.  Since the benchwork here is quite deep (the corner being out of reach), I’m providing a lift-up section adjacent to the wye, which will provide good access to the distant area.  The hole has already been cut, and my next step is some framing around the bottom of the opening to support the closed hatch.  I’ve procured some heavy-duty, full-extension drawer slides to use for the lift up guides, à la Charlie Comstock’s method which has been featured in the Model Railroad Hobbyist magazine.  When I get it finished (assuming it works as intended), I’ll post a couple photos showing it.

Come to think of it, I need to take some photos of the present state of layout construction.  I haven’t posted any new pics since back last December and there has been nice progress since then.

-Jack