The First Anniversary

This week marks the first anniversary since the start of my layout construction.  On July 10th of 2012 I completed the backdrop sky and cloud painting, and on July 15th I installed the first section of L-girder benchwork.  This past weekend I stood back and surveyed the state of this 645 square foot layout and pondered the progress.

The entire basic structure for the benchwork was completed.  All of the staging roadbed and structure is complete, along with that of Willis (Willis is the long area to the right of the trackplan, and is where the Louisiana Central and the Illinois Central railroads enter the visible portion of the layout from staging).

The staging track has been laid and the Illinois Central visible trackage is about 70% complete.  The Louisiana Central track from staging has reached the crossing with the IC and will soon be entering the LC’s Willis yard.

The two electrical track buses for this area are in, the track feeders have been installed and the DCC system is complete for these areas.

Much of the sub-roadbed for the Willis yard (located on one of the peninsulas), and the heavy industrial area at Monterey, has been cut out (but not yet installed).

All-in-all, not too bad for a years worth of weekends.

But at the same time it is a bit discouraging to think that this is all that has been accomplished over the course of a year.  I’d estimate that I’m only about 20% done with sub-roadbed and about 13% with track.  That means I have a loooong way to go!

But one bright realization is becoming apparent.  The longer I work at this thing, the less time it takes to do many of the tasks as I begin to hone in on the best way (for me) to do things.

My goal for this next year is to get the entire mainline installed and operational.  A bit ambitious you say?

No hill for a stepper!

-Jack

Disclaimer:  Even with the completed mainline, I will only be at 43% of the total trackage.

3 thoughts on “The First Anniversary

    • Ron, thanks for your comment.

      Yes, Lou is doing better though he is permanently tied to the oxygen now. I expect we’ll have the next session within a month. If I get an announcement, I’ll advise you.

      -Jack

  1. Jack,
    All seems to be working with the new software……as for the layout design (and scenery)……don’t forget to put a “dip in the road”!…Ha!

    Rick

Comments are closed.