Louisiana Central Railroad Company Layout Construction

<< Previous
Next we move to the far end of the peninsula in the previous photo.  This view shows the connection between the peninsula (left) and the alcove and benchwork along the wall.  There will be a bridge about where the angled L-girder is in the foreground.  The track will follow that narrow section of benchwork along the wall, then make a loop down at the end to enter the Town of Whitcomb which will be to the far right of the photo.  Trackage on the left will be at elevation 54" and will climb slightly to elevation 55" by the time it reaches Whitcomb on the right.  For reference, the L-girder tops are at 47".