{"id":687,"date":"2015-07-15T13:38:18","date_gmt":"2015-07-15T18:38:18","guid":{"rendered":"http:\/\/www.lacentralrr.com\/Blog\/?p=687"},"modified":"2019-01-30T19:32:42","modified_gmt":"2019-01-31T01:32:42","slug":"the-3rd-anniversary","status":"publish","type":"post","link":"https:\/\/www.lacentralrr.com\/Blog\/2015\/07\/15\/the-3rd-anniversary\/","title":{"rendered":"The 3rd Anniversary"},"content":{"rendered":"<p>Well, we are wrapping up year number three on the Louisiana Central.\u00a0 Much work has transpired over this past year, though not nearly as much trackwork was completed as I would have liked.\u00a0 But significant progress has been made nevertheless.\u00a0 All of the basic benchwork is completed, however two of the five sections are still needing roadbed for the track.\u00a0 <a href=\"https:\/\/www.lacentralrr.com\/Blog\/2015\/01\/06\/dressing-up\/\" target=\"_blank\" rel=\"noopener\">Benchwork fascia<\/a> has been installed along a substantial section of the center aisle and at Maynard adjacent to the rear wall.<\/p>\n<p>Electrical districts have been clearly defined and the DCC power, cab and booster bus wiring for five of the seven districts is complete.\u00a0 The <a href=\"https:\/\/www.lacentralrr.com\/Blog\/2014\/08\/04\/optical-detectors-installed\/\" target=\"_blank\" rel=\"noopener\">optical detection system<\/a> was completed with the exception of the panel indicators (which need panels before that happens).\u00a0 The first four <a href=\"https:\/\/www.lacentralrr.com\/Blog\/2015\/05\/25\/a-control-panel-mock-up\/\" target=\"_blank\" rel=\"noopener\">control panels<\/a> have been constructed and test fitted into their fascia &#8220;frames&#8221;.\u00a0 A few hours of wiring will see them completed.\u00a0 I&#8217;m pleased with these initial panels as they present a neat, clean appearance and are recessed to resist damage from passers-by.<\/p>\n<p>While trackwork has lagged, a good bit of it has indeed been installed.\u00a0 All of the staging tracks are in, and the entire Illinois Central presence is complete.\u00a0 The interchange to the Louisiana Central has been laid, and the passing siding at Willis yard is nearly complete.\u00a0 At the <a href=\"https:\/\/www.lacentralrr.com\/Blog\/2014\/10\/20\/industry-and-interchange-come-to-monterey\/\" target=\"_blank\" rel=\"noopener\">Monterey<\/a> end of the line the mainline and passing siding have been installed, along with the turning wye, the house track, the MOW track, the Texas and Pacific interchange, and a spur to the Sean Cannery Company.\u00a0 All of the trackage at <a href=\"https:\/\/www.lacentralrr.com\/Blog\/2014\/08\/24\/a-bit-closer-to-revenue-generation\/\" target=\"_blank\" rel=\"noopener\">Maynard<\/a> was completed some time ago.<\/p>\n<p>The Spencer Lumber Company&#8217;s line up to <a href=\"https:\/\/www.lacentralrr.com\/Blog\/2014\/09\/27\/whupped-into-submission\/\" target=\"_blank\" rel=\"noopener\">Camp 6<\/a> in the woods is under construction.\u00a0 The upper roadbed is installed and waiting for track.\u00a0 As I&#8217;ve mentioned before, that trackage needs to go in before the Louisiana Central can advance it&#8217;s mainline west out of Maynard.\u00a0 The hang-up (as I&#8217;ve also mentioned) has been the modification of about 40 Shinohara code 70 switches to make them <a href=\"https:\/\/www.lacentralrr.com\/Blog\/2013\/07\/30\/i-c-mainline-complete\/\" target=\"_blank\" rel=\"noopener\">&#8220;DCC friendly&#8221;<\/a>.\u00a0 Well, the good news is that the program has <em>finally<\/em> started.\u00a0 It shouldn&#8217;t be long before that trackage starts going down.<\/p>\n<p>Speaking of trackage, I&#8217;ve installed the Tortoise switch motors on those turnouts presently down.\u00a0 And I&#8217;ve got a good stash of Tortoises that have been <a href=\"https:\/\/www.lacentralrr.com\/Blog\/2015\/01\/20\/just-chipping-away\/\" target=\"_blank\" rel=\"noopener\">inspected, lubed, pre-wired<\/a>, and are ready for installation as additional track is laid.<\/p>\n<p>I started roughing in for a bit of scenery recently.\u00a0 There is a stretch between Willis and Maynard that consists only of the track on 2&#8243; wide roadbed.\u00a0 I thought it might be prudent to at least install the hardshell scenery base between the roadbed and the fascia and also a bit to the far side of the track just to make sure nothing takes a quick trip to the valley floor 385&#8242; below.<\/p>\n<p>Oh, and car kits . . . I&#8217;ve started <a href=\"https:\/\/www.lacentralrr.com\/Blog\/2015\/04\/13\/building-a-few-kits\/\" target=\"_blank\" rel=\"noopener\">assembling some car kits<\/a>.\u00a0 I&#8217;ve completed nearly 50 kits now (of the 300 or so kits in my stash).\u00a0 Admittedly, I started with the low hanging fruit, going through many Accurail kits, along with a few Walthers, Atlas and McKean.\u00a0 All of these cars now have metal wheelsets and Kadee couplers, and all have been certified road worthy.<\/p>\n<p>Plenty of other things have been done, some not directly related to the layout (shelving in the workshop, drill press table, <a href=\"https:\/\/www.lacentralrr.com\/Blog\/2015\/06\/11\/dremel-tool-and-bit-rack\/\" target=\"_blank\" rel=\"noopener\">Dremel bit rack<\/a>, and a few other improvements).\u00a0 Even a bit of lighting work was done.<\/p>\n<p>All-in-all, it really wasn&#8217;t a bad year.\u00a0 During the second year, I had started burning out on construction.\u00a0 The vast majority of the work had been on benchwork, roadbed and some track.\u00a0 I decided to broaden the scope of work on the layout and began putting more time in on the other aspects of the layout.\u00a0 After all, the layout will not become operational until all these things are done, including some basic scenery (as mentioned above).\u00a0 After a long break from trackwork, I&#8217;m now in the mood to tackle some more and have refocused on that task again.<\/p>\n<p>I had decided during my last annual assessment to not make predictions of what I&#8217;d accomplish in the upcoming year, then promptly made a prediction (which of course, failed to materialize).\u00a0 This year I&#8217;m sticking to that tenet.<\/p>\n<p>However, I&#8217;m optimistic about the fourth year ahead.<\/p>\n<p><em>-Jack<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Well, we are wrapping up year number three on the Louisiana Central.\u00a0 Much work has transpired over this past year, though not nearly as much trackwork was completed as I would have liked.\u00a0 But significant progress has been made nevertheless.\u00a0 &hellip; <a href=\"https:\/\/www.lacentralrr.com\/Blog\/2015\/07\/15\/the-3rd-anniversary\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-687","post","type-post","status-publish","format-standard","hentry","category-general"],"_links":{"self":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts\/687","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/comments?post=687"}],"version-history":[{"count":8,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts\/687\/revisions"}],"predecessor-version":[{"id":1513,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts\/687\/revisions\/1513"}],"wp:attachment":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/media?parent=687"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/categories?post=687"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/tags?post=687"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}