{"id":45,"date":"2012-10-09T11:49:43","date_gmt":"2012-10-09T16:49:43","guid":{"rendered":"http:\/\/blog.lacentralrr.com\/2012\/10\/09\/the-spencer-logging-operation\/"},"modified":"2015-03-15T16:38:04","modified_gmt":"2015-03-15T21:38:04","slug":"the-spencer-logging-operation","status":"publish","type":"post","link":"https:\/\/www.lacentralrr.com\/Blog\/2012\/10\/09\/the-spencer-logging-operation\/","title":{"rendered":"The Spencer Logging Operation"},"content":{"rendered":"<p>One of the featured industries on the layout will be the logging operation of the Spencer Lumber Company.\u00a0 Spencer&#8217;s mill will be located at the town of Oneida (on one of the layout&#8217;s peninsulas), and will be patterned somewhat loosely on the real-life mill of the former Crowell Long Leaf Lumber Company.\u00a0 The Crowell facility still lives as a museum here in Louisiana and I wrote a little piece about it in the blog post <em>The Southern Forest Heritage Museum<\/em> back in June of 2011.<\/p>\n<p>The Crowell property has all the pieces in place for one to photograph and study, and while I can&#8217;t model the facility literally due to space constraints, it will at least allow me to include the vital infrastructure necessary for a lumber mill.\u00a0 Once you understand the work-flow and the function of the various buildings, planning a &#8220;correct&#8221; model should be much easier.<\/p>\n<p>However, the other part of the operation &#8211; the actual harvesting of the timber &#8211; had me scratching my head.\u00a0 I have a nice run from the mill up to the logging area, which even includes a double switchback, and I have a loading area at the top.\u00a0 But the space is so limited, especially in depth, that I just didn&#8217;t have any idea how I was going to model any sort of reasonable logging activity.\u00a0 A few weeks ago I spied a copy of Kalmbach&#8217;s book, <em>The Model Railroader&#8217;s Guide to Logging Railroads<\/em>, so I purchased it.\u00a0 In general it is a nice book, with a good description of all the various facets of the logging industry.\u00a0 Admittedly if falls far short of being the definitive volume that one needs to pull off such a modeling endeavor; that would take many volumes to accomplish.\u00a0 However there was one short section in the book that provided me with my salvation.\u00a0 In short, it was the &#8220;reload&#8221; operation.\u00a0 This was a situation where trucks were used to haul the logs out of the woods, and to a reloading point where the logs were transferred from the trucks to the railhead.\u00a0 This became very common in the later years of railroad logging operations (which I will be modeling in 1964) as trucks and equipment were better able to penetrate into the forest.\u00a0 In fact, this method often became more economical than re-laying track to all the various cutting sites.\u00a0 This idea will be perfect for my line.\u00a0 All I need do is add some kind of loader at the high end (a McGiffert or a Barnhart) and I&#8217;ll be in business.<\/p>\n<p>While the logging operation won&#8217;t be the biggest traffic generator on the layout, I think it will be the most interesting, and I look forward to actually building it.<\/p>\n<p><em>-Jack<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>One of the featured industries on the layout will be the logging operation of the Spencer Lumber Company.\u00a0 Spencer&#8217;s mill will be located at the town of Oneida (on one of the layout&#8217;s peninsulas), and will be patterned somewhat loosely &hellip; <a href=\"https:\/\/www.lacentralrr.com\/Blog\/2012\/10\/09\/the-spencer-logging-operation\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22,13],"tags":[],"class_list":["post-45","post","type-post","status-publish","format-standard","hentry","category-operations","category-proto-research"],"_links":{"self":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts\/45","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/comments?post=45"}],"version-history":[{"count":1,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts\/45\/revisions"}],"predecessor-version":[{"id":591,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts\/45\/revisions\/591"}],"wp:attachment":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/media?parent=45"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/categories?post=45"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/tags?post=45"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}