{"id":42,"date":"2012-08-21T16:56:04","date_gmt":"2012-08-21T21:56:04","guid":{"rendered":"http:\/\/blog.lacentralrr.com\/2012\/08\/21\/basic-benchwork-nearing-completion\/"},"modified":"2015-03-15T16:40:24","modified_gmt":"2015-03-15T21:40:24","slug":"basic-benchwork-nearing-completion","status":"publish","type":"post","link":"https:\/\/www.lacentralrr.com\/Blog\/2012\/08\/21\/basic-benchwork-nearing-completion\/","title":{"rendered":"Basic Benchwork Nearing Completion"},"content":{"rendered":"<p>The benchwork on the new layout is progressing quite nicely.\u00a0 All five of the major sections have been completed.\u00a0 Next I will be connecting a couple of the major sections with shorter &#8220;bridge&#8221; pieces, including the swing (or drop) section across the room&#8217;s doorway.\u00a0 I also have to put in a number of angled pieces at intersections of the major sections, and I want to put in some reinforcement material in key places.<\/p>\n<p>The framework is quite strong and is very light.\u00a0 In fact, it is so light that it is easy to move by bumping into it.\u00a0 I hope the added mass and weight of the (future) joists, risers, roadbed and scenery is enough to anchor the whole thing down.\u00a0 The legs aren&#8217;t secured to the floor as I don&#8217;t want to drill holes through the carpet into the concrete.\u00a0 I will be depending solely on layout weight to keep it in place.<\/p>\n<p>I could probably wrap things up in about two weekends, however next weekend will be cut short while I take a break to do some railroading over at Lou Schultz&#8217;s C&amp;O layout.\u00a0 I&#8217;m looking forward to the operating session.\u00a0 I also want to do one more evaluation of the roadbed elevations (heights above the floor) of his layout while there.\u00a0 I&#8217;ve tentatively set the various elevations of my roadbed based on my experiences operating at Lou&#8217;s.\u00a0 This will be my last chance to confirm my comfort with these elevations since my roadbed will likely start going in sometime in September.<\/p>\n<p>The startling revelation has hit me recently that I need to start working on much more than the layout structure itself.\u00a0 I have an entire fleet of locomotives that need to be cleaned, adjusted, lubed and have DCC decoders installed.\u00a0 And only about 15% of my car fleet is assembled and ready.\u00a0 Only one structure that I plan to use is ready, and that is a mere shack.\u00a0 So much to do!<\/p>\n<p>But the layout, after years and years of delay, is finally under construction.\u00a0 And that is good and I am pleased!<\/p>\n<p><em>-Jack<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The benchwork on the new layout is progressing quite nicely.\u00a0 All five of the major sections have been completed.\u00a0 Next I will be connecting a couple of the major sections with shorter &#8220;bridge&#8221; pieces, including the swing (or drop) section &hellip; <a href=\"https:\/\/www.lacentralrr.com\/Blog\/2012\/08\/21\/basic-benchwork-nearing-completion\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-42","post","type-post","status-publish","format-standard","hentry","category-benchwork"],"_links":{"self":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts\/42","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/comments?post=42"}],"version-history":[{"count":1,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts\/42\/revisions"}],"predecessor-version":[{"id":594,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts\/42\/revisions\/594"}],"wp:attachment":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/media?parent=42"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/categories?post=42"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/tags?post=42"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}