{"id":3377,"date":"2023-07-16T11:02:49","date_gmt":"2023-07-16T16:02:49","guid":{"rendered":"https:\/\/www.lacentralrr.com\/Blog\/?p=3377"},"modified":"2023-07-16T11:02:49","modified_gmt":"2023-07-16T16:02:49","slug":"lcrr-the-11th-anniversary-and-a-restoration-progress-report","status":"publish","type":"post","link":"https:\/\/www.lacentralrr.com\/Blog\/2023\/07\/16\/lcrr-the-11th-anniversary-and-a-restoration-progress-report\/","title":{"rendered":"LCRR: the 11th Anniversary and a Restoration Progress Report"},"content":{"rendered":"\n<p>Yesterday was the 11th anniversary of the start of construction on the Louisiana Central Railroad in 2012. Unfortunately 49 months later, construction came to a rapid and grinding halt with the <a rel=\"noreferrer noopener\" href=\"https:\/\/www.lacentralrr.com\/Blog\/2016\/08\/27\/flood\/\" data-type=\"post\" data-id=\"928\" target=\"_blank\">Great Flood of 2016<\/a> that consumed the vast majority of my community and surrounding areas. <a href=\"https:\/\/www.lacentralrr.com\/Blog\/2016\/11\/20\/the-aftermath\/\" data-type=\"post\" data-id=\"945\" target=\"_blank\" rel=\"noreferrer noopener\">In the aftermath<\/a>, while my home was fully restored 15 months later, the building housing the railroad lie almost dormant, with only necessary work occurring to stabilize things. Add to that several &#8220;false starts&#8221;, where I did bits of work from time to time, primarily electrical, but mainly &#8220;cleaning up&#8221; the demolition to aid with the eventual reconstruction.<\/p>\n\n\n\n<p>However about a year ago I finally started the reconstruction of the building in earnest, and it has come a long way since. It&#8217;s been awhile since I&#8217;ve posted an update, that being right after the new shop cabinets were installed. But with so many other tasks to complete, I didn&#8217;t start painting the cabinets until perhaps a month ago. Painting cabinets is a tedious and time consuming affair, with the initial sanding, then primer and finish coats of paint (inside and out). I&#8217;m happy to announce that the painting is complete, and offer the photos below as proof.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2023\/07\/Shop-Cabs-Paint-North.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"512\" src=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2023\/07\/Shop-Cabs-Paint-North.jpg\" alt=\"Shop-Cabs-Paint-North\" class=\"wp-image-3374\" srcset=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2023\/07\/Shop-Cabs-Paint-North.jpg 768w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2023\/07\/Shop-Cabs-Paint-North-300x200.jpg 300w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2023\/07\/Shop-Cabs-Paint-North-450x300.jpg 450w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/a><figcaption class=\"wp-element-caption\">This view is the storage area and secondary work surface.  I applied two finish coats, and I&#8217;m pleased with the result.  Pulls matching the drawers will be installed on the cabinet doors later this week.  The counter-top will be receiving plastic laminate soon.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2023\/07\/Shop-Cabs-Paint-South.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"512\" src=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2023\/07\/Shop-Cabs-Paint-South.jpg\" alt=\"Shop-Cabs-Paint-South\" class=\"wp-image-3375\" srcset=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2023\/07\/Shop-Cabs-Paint-South.jpg 768w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2023\/07\/Shop-Cabs-Paint-South-300x200.jpg 300w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2023\/07\/Shop-Cabs-Paint-South-450x300.jpg 450w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/a><figcaption class=\"wp-element-caption\">This view is the primary work area, with that open area being my work bench.  I use a drafting stool on wheels while seated there.  There will be a small utility sink down near the left end.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2023\/07\/Shop-Cabs-Paint-Open.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"512\" src=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2023\/07\/Shop-Cabs-Paint-Open.jpg\" alt=\"Shop-Cabs-Paint-Open\" class=\"wp-image-3376\" srcset=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2023\/07\/Shop-Cabs-Paint-Open.jpg 768w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2023\/07\/Shop-Cabs-Paint-Open-300x200.jpg 300w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2023\/07\/Shop-Cabs-Paint-Open-450x300.jpg 450w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/a><figcaption class=\"wp-element-caption\">A glimpse inside a typical drawer, and the storage area below with an adjustable shelf.<\/figcaption><\/figure>\n\n\n\n<p>As I mentioned above, I plan to have plastic laminate installed over the counter-tops. I used that on the earlier cabinets, and it worked out very well, hence I&#8217;ll use it again. The only other things remaining in the shop are the baseboards and shoe mold. After that, I&#8217;ll start laying the flooring down in the train room itself. I&#8217;m going to use LVT &#8220;planks&#8221; of 9&#8243; x 60&#8243; in size. It will be a challenge with 55 legs supporting a layout in the way. But I have a plan, and I&#8217;ll report on that later (if the plan works \ud83d\ude42 ) along with pics.<\/p>\n\n\n\n<p>There have been many items and issues in the restoration that I haven&#8217;t documented.  But for those interested, here&#8217;s a list of postings detailing the progress of the larger aspects of this restoration project completed thus far:<\/p>\n\n\n\n<p><a rel=\"noreferrer noopener\" href=\"https:\/\/www.lacentralrr.com\/Blog\/2020\/08\/03\/rising-from-the-ashes\/\" data-type=\"post\" data-id=\"2163\" target=\"_blank\">Rising From the Ashes<\/a><br><a href=\"https:\/\/www.lacentralrr.com\/Blog\/2022\/07\/03\/rising-from-the-ashes-part-deux\/\" data-type=\"post\" data-id=\"2909\" target=\"_blank\" rel=\"noreferrer noopener\">Rising From the Ashes (Part Deux)<\/a><br><a rel=\"noreferrer noopener\" href=\"https:\/\/www.lacentralrr.com\/Blog\/2022\/08\/18\/lcrr-first-progress-report\/\" data-type=\"post\" data-id=\"2988\" target=\"_blank\">The First Progress Report<\/a><br><a href=\"https:\/\/www.lacentralrr.com\/Blog\/2022\/08\/28\/lcrr-repairs-started-in-the-train-room\/\" data-type=\"post\" data-id=\"3008\" target=\"_blank\" rel=\"noreferrer noopener\">Repairs Started in the Train Room<\/a><br><a href=\"https:\/\/www.lacentralrr.com\/Blog\/2022\/09\/04\/lcrr-recent-drywall-progress\/\" data-type=\"post\" data-id=\"3029\" target=\"_blank\" rel=\"noreferrer noopener\">Recent Drywall Progress<\/a><br><a href=\"https:\/\/www.lacentralrr.com\/Blog\/2022\/09\/24\/lcrr-final-sheet-of-drywall-hung\/\" data-type=\"post\" data-id=\"3050\" target=\"_blank\" rel=\"noreferrer noopener\">Final Sheet of Drywall Hung!<\/a><br><a rel=\"noreferrer noopener\" href=\"https:\/\/www.lacentralrr.com\/Blog\/2022\/11\/19\/lcrr-drywall-installation-completed\/\" data-type=\"post\" data-id=\"3118\" target=\"_blank\">Drywall Installation Completed<\/a><br><a href=\"https:\/\/www.lacentralrr.com\/Blog\/2022\/12\/03\/lcrr-walls-painted\/\" data-type=\"post\" data-id=\"3139\" target=\"_blank\" rel=\"noreferrer noopener\">Walls Painted<\/a><br><a rel=\"noreferrer noopener\" href=\"https:\/\/www.lacentralrr.com\/Blog\/2022\/12\/24\/lcrr-last-progress-report-of-2022\/\" data-type=\"post\" data-id=\"3168\" target=\"_blank\">Last Progress Report of 2022<\/a><br><a rel=\"noreferrer noopener\" href=\"https:\/\/www.lacentralrr.com\/Blog\/2023\/04\/01\/lcrr-shop-cabinets-installed\/\" data-type=\"post\" data-id=\"3279\" target=\"_blank\">Shop Cabinets Installed<\/a><\/p>\n\n\n\n<p><em>-Jack<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Yesterday was the 11th anniversary of the start of construction on the Louisiana Central Railroad in 2012. Unfortunately 49 months later, construction came to a rapid and grinding halt with the Great Flood of 2016 that consumed the vast majority &hellip; <a href=\"https:\/\/www.lacentralrr.com\/Blog\/2023\/07\/16\/lcrr-the-11th-anniversary-and-a-restoration-progress-report\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,23],"tags":[],"class_list":["post-3377","post","type-post","status-publish","format-standard","hentry","category-general","category-room-prep"],"_links":{"self":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts\/3377","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/comments?post=3377"}],"version-history":[{"count":12,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts\/3377\/revisions"}],"predecessor-version":[{"id":3389,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts\/3377\/revisions\/3389"}],"wp:attachment":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/media?parent=3377"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/categories?post=3377"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/tags?post=3377"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}