{"id":3118,"date":"2022-11-19T14:18:19","date_gmt":"2022-11-19T20:18:19","guid":{"rendered":"https:\/\/www.lacentralrr.com\/Blog\/?p=3118"},"modified":"2022-11-19T14:18:19","modified_gmt":"2022-11-19T20:18:19","slug":"lcrr-drywall-installation-completed","status":"publish","type":"post","link":"https:\/\/www.lacentralrr.com\/Blog\/2022\/11\/19\/lcrr-drywall-installation-completed\/","title":{"rendered":"LCRR: Drywall Installation Completed"},"content":{"rendered":"\n<p>A major milestone has been reached, with the drywall installation and finishing completed!  In my last couple updates I showed hanging the drywall with the help of my (now) skilled helpers, Wayne Robichaux and Ron Findley.  For the finishing, which included taping, floating and texturing (to match the upper half of the walls), I surrendered to a professional.  I had spoken with a few pros several years ago, and none were interested in the job because of the extra difficulty of working below the train layout benchwork, and all the &#8220;special requirements&#8221; that I had.  Fortunately I was able to find a fellow who was willing to undergo this project, and here are a sampling of photos to show the finished result.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Prep_0002.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"563\" src=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Prep_0002.jpg\" alt=\"Shop: Finishing Prep\" class=\"wp-image-3112\" srcset=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Prep_0002.jpg 750w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Prep_0002-300x225.jpg 300w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Prep_0002-400x300.jpg 400w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><\/a><figcaption class=\"wp-element-caption\">A before photo of the shop, with only minimal taping of the joints.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Textured_01.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"563\" src=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Textured_01.jpg\" alt=\"Shop: Textured\" class=\"wp-image-3113\" srcset=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Textured_01.jpg 750w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Textured_01-300x225.jpg 300w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Textured_01-400x300.jpg 400w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><\/a><figcaption class=\"wp-element-caption\">And the finished walls of the shop.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Prep_0024.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"563\" src=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Prep_0024.jpg\" alt=\"Train Room: Finishing Prep\" class=\"wp-image-3116\" srcset=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Prep_0024.jpg 750w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Prep_0024-300x225.jpg 300w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Prep_0024-400x300.jpg 400w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><\/a><figcaption class=\"wp-element-caption\">A before photo of the layout room, with only minimal taping of the joints.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Textured_08.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"563\" src=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Textured_08.jpg\" alt=\"Train Room: Textured\" class=\"wp-image-3117\" srcset=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Textured_08.jpg 750w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Textured_08-300x225.jpg 300w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Textured_08-400x300.jpg 400w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><\/a><figcaption class=\"wp-element-caption\">And the finished walls of the layout room.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Prep_0013.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"563\" src=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Prep_0013.jpg\" alt=\"Train Room: More Finishing Prep\" class=\"wp-image-3114\" srcset=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Prep_0013.jpg 750w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Prep_0013-300x225.jpg 300w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Prep_0013-400x300.jpg 400w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><\/a><figcaption class=\"wp-element-caption\">Another before photo of the layout room, with only minimal taping of the joints.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Textured_05.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"563\" src=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Textured_05.jpg\" alt=\"Train Room: Another Textured\" class=\"wp-image-3115\" srcset=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Textured_05.jpg 750w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Textured_05-300x225.jpg 300w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/11\/Bldg-Drywall-Textured_05-400x300.jpg 400w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><\/a><figcaption class=\"wp-element-caption\">And the finished walls of this area of the layout room.<\/figcaption><\/figure>\n\n\n\n<p>In a few more days (after I&#8217;m sure the texture is thoroughly dry and hardened), I&#8217;ll start the painting process with primer followed by a couple coats of color.  At that point, only some trim will be needed to complete the walls.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A major milestone has been reached, with the drywall installation and finishing completed! In my last couple updates I showed hanging the drywall with the help of my (now) skilled helpers, Wayne Robichaux and Ron Findley. For the finishing, which &hellip; <a href=\"https:\/\/www.lacentralrr.com\/Blog\/2022\/11\/19\/lcrr-drywall-installation-completed\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,23],"tags":[],"class_list":["post-3118","post","type-post","status-publish","format-standard","hentry","category-general","category-room-prep"],"_links":{"self":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts\/3118","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/comments?post=3118"}],"version-history":[{"count":1,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts\/3118\/revisions"}],"predecessor-version":[{"id":3119,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts\/3118\/revisions\/3119"}],"wp:attachment":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/media?parent=3118"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/categories?post=3118"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/tags?post=3118"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}