{"id":3029,"date":"2022-09-04T10:09:15","date_gmt":"2022-09-04T15:09:15","guid":{"rendered":"https:\/\/www.lacentralrr.com\/Blog\/?p=3029"},"modified":"2022-09-04T10:09:15","modified_gmt":"2022-09-04T15:09:15","slug":"lcrr-recent-drywall-progress","status":"publish","type":"post","link":"https:\/\/www.lacentralrr.com\/Blog\/2022\/09\/04\/lcrr-recent-drywall-progress\/","title":{"rendered":"LCRR: Recent Drywall Progress"},"content":{"rendered":"\n<p>Work is progressing nicely in the train room.  I&#8217;ve had assistance this week from a couple friends, Wayne Robichaux and Ron Findley.  Their help was vital in order to hang the 8&#8242; widths of drywall.  Saturday, unbeknownst to me, Ron recorded a few pictures of the work in progress.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/09\/Insulated-Wall-Waiting-for-Drywall.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"563\" src=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/09\/Insulated-Wall-Waiting-for-Drywall.jpg\" alt=\"Insulated Wall Waiting for Drywall\" class=\"wp-image-3024\" srcset=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/09\/Insulated-Wall-Waiting-for-Drywall.jpg 750w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/09\/Insulated-Wall-Waiting-for-Drywall-300x225.jpg 300w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/09\/Insulated-Wall-Waiting-for-Drywall-400x300.jpg 400w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><\/a><figcaption>Ron made this image of the area where we were working before things got started.<\/figcaption><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/09\/Laying-Out-the-Electrical-Boxes.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"563\" height=\"750\" src=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/09\/Laying-Out-the-Electrical-Boxes.jpg\" alt=\"Laying Out the Electrical Boxes\" class=\"wp-image-3025\" srcset=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/09\/Laying-Out-the-Electrical-Boxes.jpg 563w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/09\/Laying-Out-the-Electrical-Boxes-225x300.jpg 225w\" sizes=\"auto, (max-width: 563px) 100vw, 563px\" \/><\/a><figcaption>Here I am laying out the locations of the boxes for the electrical receptacles.  This sheet alone had four boxes in it!<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/09\/Cutting-Out-the-Electrical-Boxes.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"720\" height=\"960\" src=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/09\/Cutting-Out-the-Electrical-Boxes.jpg\" alt=\"Cutting Out the Electrical Boxes\" class=\"wp-image-3026\" srcset=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/09\/Cutting-Out-the-Electrical-Boxes.jpg 720w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/09\/Cutting-Out-the-Electrical-Boxes-225x300.jpg 225w\" sizes=\"auto, (max-width: 720px) 100vw, 720px\" \/><\/a><figcaption>And now I&#8217;m cutting out the box openings.  No, there is no toilet in the train room.  This one will find it&#8217;s way back into the restroom once the walls are finished and painted.  \ud83d\ude42<\/figcaption><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/09\/Attaching-the-Drywall.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"720\" height=\"960\" src=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/09\/Attaching-the-Drywall.jpg\" alt=\"Attaching the Drywall\" class=\"wp-image-3027\" srcset=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/09\/Attaching-the-Drywall.jpg 720w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/09\/Attaching-the-Drywall-225x300.jpg 225w\" sizes=\"auto, (max-width: 720px) 100vw, 720px\" \/><\/a><figcaption>A sheet of drywall being screwed to the studs.<\/figcaption><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/09\/The-Drywall-is-Up.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"563\" src=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/09\/The-Drywall-is-Up.jpg\" alt=\"The Drywall is Up!\" class=\"wp-image-3028\" srcset=\"https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/09\/The-Drywall-is-Up.jpg 750w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/09\/The-Drywall-is-Up-300x225.jpg 300w, https:\/\/www.lacentralrr.com\/Blog\/wp-content\/uploads\/2022\/09\/The-Drywall-is-Up-400x300.jpg 400w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><\/a><figcaption>This sheet of drywall is hung and ready for finishing.  The rag is covering the electrical equipment and connections for one of the model railroad districts.  It&#8217;s one of three equipment locations.  The L-girder bracing on the wall side has been temporarily removed to allow better access to the wall.<\/figcaption><\/figure>\n\n\n\n<p>We&#8217;re on the downhill part of the drywall installation now, with a 28&#8242; long wall, and half dozen &#8220;short&#8221; walls left to complete.  My sincere thanks go out to Wayne and Ron for volunteering to help me with this work.<\/p>\n\n\n\n<p>For those new to the blog, you can see the post <a rel=\"noreferrer noopener\" href=\"https:\/\/www.lacentralrr.com\/Blog\/2022\/07\/03\/rising-from-the-ashes-part-deux\/\" target=\"_blank\"><strong>Rising From the Ashes (Part Deux)<\/strong><\/a> for a starting point to read the story behind this work.<\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Work is progressing nicely in the train room. I&#8217;ve had assistance this week from a couple friends, Wayne Robichaux and Ron Findley. Their help was vital in order to hang the 8&#8242; widths of drywall. Saturday, unbeknownst to me, Ron &hellip; <a href=\"https:\/\/www.lacentralrr.com\/Blog\/2022\/09\/04\/lcrr-recent-drywall-progress\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,23],"tags":[],"class_list":["post-3029","post","type-post","status-publish","format-standard","hentry","category-general","category-room-prep"],"_links":{"self":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts\/3029","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/comments?post=3029"}],"version-history":[{"count":4,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts\/3029\/revisions"}],"predecessor-version":[{"id":3033,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts\/3029\/revisions\/3033"}],"wp:attachment":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/media?parent=3029"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/categories?post=3029"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/tags?post=3029"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}