{"id":114,"date":"2013-07-09T14:05:26","date_gmt":"2013-07-09T19:05:26","guid":{"rendered":"http:\/\/blog.lacentralrr.com\/?p=114"},"modified":"2015-03-15T16:20:09","modified_gmt":"2015-03-15T21:20:09","slug":"the-first-anniversary","status":"publish","type":"post","link":"https:\/\/www.lacentralrr.com\/Blog\/2013\/07\/09\/the-first-anniversary\/","title":{"rendered":"The First Anniversary"},"content":{"rendered":"<p>This week marks the first anniversary since the start of my layout construction.\u00a0 On July 10th of 2012 I completed the backdrop sky and cloud painting, and on July 15th I installed the first section of L-girder benchwork.\u00a0 This past weekend I stood back and surveyed the state of this 645 square foot layout and pondered the progress.<\/p>\n<p>The entire basic structure for the benchwork was completed.\u00a0 All of the staging roadbed and structure is complete, along with that of Willis (Willis is the long area to the right of the trackplan, and is where the Louisiana Central and the Illinois Central railroads enter the visible portion of the layout from staging).<\/p>\n<p>The staging track has been laid and the Illinois Central visible trackage is about 70% complete.\u00a0 The Louisiana Central track from staging has reached the crossing with the IC and will soon be entering the LC&#8217;s Willis yard.<\/p>\n<p>The two electrical track buses for this area are in, the track feeders have been installed and the DCC system is complete for these areas.<\/p>\n<p>Much of the sub-roadbed for the Willis yard (located on one of the peninsulas), and the heavy industrial area at Monterey, has been cut out (but not yet installed).<\/p>\n<p>All-in-all, not too bad for a years worth of weekends.<\/p>\n<p>But at the same time it is a bit discouraging to think that this is all that has been accomplished over the course of a year.\u00a0 I&#8217;d estimate that I&#8217;m only about 20% done with sub-roadbed and about 13% with track.\u00a0 That means I have a loooong way to go!<\/p>\n<p>But one bright realization is becoming apparent.\u00a0 The longer I work at this thing, the less time it takes to do many of the tasks as I begin to hone in on the best way (for me) to do things.<\/p>\n<p>My goal for this next year is to get the entire mainline installed and operational.\u00a0 A bit ambitious you say?<\/p>\n<p>No hill for a stepper!<\/p>\n<p><em>-Jack<\/em><\/p>\n<p><em>Disclaimer:<\/em>\u00a0 Even with the completed mainline, I will only be at 43% of the total trackage.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>This week marks the first anniversary since the start of my layout construction.\u00a0 On July 10th of 2012 I completed the backdrop sky and cloud painting, and on July 15th I installed the first section of L-girder benchwork.\u00a0 This past &hellip; <a href=\"https:\/\/www.lacentralrr.com\/Blog\/2013\/07\/09\/the-first-anniversary\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7,17,2,12,8],"tags":[],"class_list":["post-114","post","type-post","status-publish","format-standard","hentry","category-benchwork","category-electrical-dcc","category-general","category-misc-layout-constr","category-roadbed-track"],"_links":{"self":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts\/114","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/comments?post=114"}],"version-history":[{"count":1,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts\/114\/revisions"}],"predecessor-version":[{"id":578,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/posts\/114\/revisions\/578"}],"wp:attachment":[{"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/media?parent=114"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/categories?post=114"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lacentralrr.com\/Blog\/wp-json\/wp\/v2\/tags?post=114"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}