LCRR: Walls Painted

Yet another milestone has been reached in the flood recovery efforts: all of the building walls have been primed and painted. The shop (hopefully) will soon be receiving new cabinets. The floor tiles reveal the footprint of the original cabinets.

Shop: Painted
The shop walls (and the adjacent restroom) have received their paint.
Train Room: Painted
A typical view in the layout room. I painted these walls white to add brightness below the benchwork while working beneath the layout.

In addition to the cabinets, the next step is the installation of the doors, and the trim-out. Flooring will follow that.

2 thoughts on “LCRR: Walls Painted

Comments are closed.