LCRR: First Progress Report

The restoration of the Louisiana Central Railroad model railroad hobby building (aka ‘the Train Room’) is progressing, albeit a bit slowly. But it is progressing. I’ve hung the drywall in the shop, entry and restroom, and here are the photos to prove it!

LCRR Shop - 1st Piece of Drywall
The very first piece of drywall in the shop has been hung!
LCRR Shop Area
This view is the shop area. There will be cabinets with counters below both of those wall shelves, their footprint to be within those bare concrete areas. The cabinet unit at right will have a small utility sink at the piping rough-in. The primary work area is also at right, with the fluorescent light above providing extra illumination.
LCRR Shop Foyer
Standing in the shop area and looking the opposite direction, we see the building entry door at left, the restroom straight ahead, and the entry to the train room at right. I had a few scraps of drywall left from my home flood restoration so I used them in this area (the reason for the different colors).
LCRR Restroom
Peaking in the doorway to the restroom, the lavatory will be here, the toilet to the right (out of this view).

There is still much work to do in these rooms to finish the drywall: the floating and taping work, and then texturing. But I plan to complete the insulation and drywall installation in the train room first. And I’ve started the prep work in there already (with a bit more to do), so should be hanging the rock by early next week.

For those new to the blog, you can see the post Rising From the Ashes (Part Deux) for a starting point to read the story behind this work. I’ll feature more photos of the restoration from time to time as the work progresses.