Louisiana Central Railroad Company Room Construction

<< Previous
And the final view after the priming and painting.  The black line on the floor at left marks the edge of the future benchwork.  I've still got to lay out the peninsulas.  I'll then transfer key points to the ceiling using a plumb bob in order to position the light strips.
Next >>

Return to Room Construction Photos Home
© 2010 Jack C. Shall